Everything Inside IronStreak

Streaks, XP, levels, achievements, 91 exercises, progress charts, PR tracking, Dynamic Island, and more. Here is every feature that makes IronStreak the most addictive workout tracker on iOS.

Gamification

Streaks, XP & Levels

Every workout earns XP and extends your streak. Level up from Newbie to Gym Rat to Iron Addict and all the way to Olympian across 20 titles. Miss a day? Use a streak freeze to keep your chain alive.

XP multipliers reward consistency: earn bonus XP for your first workout of the week, and get a comeback bonus when you return after a break. The longer your streak, the more XP you earn.

Streak Ring 20 Levels Streak Freezes XP Multipliers Comeback Bonus
IronStreak streak dashboard showing current streak, XP progress bar, and level title
IronStreak active workout screen with set logging, rest timer, and exercise cards

Workout Tracking

Built for the Gym Floor

IronStreak pre-fills every set from your last session with "beat yesterday" arrows so you always know what to aim for. One-handed drag steppers let you adjust weight and reps mid-set without putting down the bar.

The rest timer starts automatically after each set with skip and extend buttons and a visible progress bar. Rename workouts mid-session, add or remove exercises and sets on the fly, and cancel with a confirmation if you have logged sets.

Pre-fill Drag Steppers Rest Timer Rename Mid-Session Add/Remove Sets

Exercise Library

91 Exercises. 6 Muscle Groups. 3 Tracking Types.

Every exercise includes form cues, common mistakes, a YouTube form guide link, and a personal notes field. Create unlimited custom exercises with your own name, muscle group, and tracking type.

13

Chest

Bench press, incline dumbbell press, cable flyes, push-ups, and more.

15

Back

Deadlifts, pull-ups, barbell rows, lat pulldowns, cable rows, and more.

12

Shoulders

Overhead press, lateral raises, face pulls, Arnold press, and more.

22

Legs

Squats, leg press, Romanian deadlifts, lunges, calf raises, and more.

17

Arms

Barbell curls, tricep pushdowns, hammer curls, skull crushers, and more.

12

Core

Planks, hanging leg raises, cable crunches, Russian twists, and more.

Weight + Reps Bodyweight + Reps Time-Based Custom Exercises Form Cues YouTube Guides Personal Notes

Routines

Your Program, Your Way

IronStreak generates routines during onboarding based on your experience level, goals, and weekly target. Or go freestyle and save your workout as a routine after you finish.

2

Upper / Lower

2 days per week. Full upper body one day, full lower body the next. Perfect for beginners.

3

Push / Pull / Legs

3 days per week. Each session targets pushing, pulling, or leg muscles for balanced growth.

6

PPL x2

5-6 days per week. Hit every muscle group twice for maximum volume and progression.

Auto-Generated Experience-Scaled Rename Routines Delete Routines Save Freestyle

Progress

Charts That Prove You Are Getting Stronger

Track your estimated 1RM over time with a time range picker (1 month, 3 months, 1 year, or all time). The PR Board shows your personal records across all tracking types: estimated 1RM for weighted exercises, most reps for bodyweight exercises, and longest duration for timed exercises.

Every PR is dated and displayed with its own icon. Watch your total volume trend upward as you build real, measurable strength.

1RM Charts PR Board Volume Trends Time Range Picker
IronStreak progress charts showing estimated 1RM over time and PR board
IronStreak achievements grid showing bronze, silver, gold, and platinum trophies

Achievements

50 Achievements. 4 Trophy Tiers.

Achievements span 5 categories: streak milestones, consistency goals, strength PRs, volume totals, and progressive overload. Each achievement has four tiers that get progressively harder to unlock.

When you unlock a trophy, IronStreak shows a PlayStation-style celebration overlay with the tier, title, and what you did to earn it. Chase Bronze, then Silver, then Gold, then the elusive Platinum.

Bronze Silver Gold Platinum

Dynamic Island

Your Workout on the Lock Screen

IronStreak uses Live Activities and the Dynamic Island to keep your workout visible even when your phone is locked. See your current exercise, set count, and weight at a glance.

During rest periods, the Dynamic Island shows a countdown timer. When you hit a new PR, it celebrates right there in the pill. No need to unlock your phone between sets.

Live Activity Dynamic Island Rest Countdown PR Celebration
IronStreak workout complete screen showing XP earned, duration, and volume stats

Privacy First

Your Data Never Leaves Your Device

IronStreak stores everything locally using Apple's SwiftData framework. There are no accounts to create, no cloud sync, no analytics, no tracking pixels, and no advertising libraries. Your workout data is yours alone.

On-Device Storage No Accounts No Analytics No Ads No Tracking

Read our Privacy Policy

Feature Questions

Can I create my own exercises?

Yes. You can create unlimited custom exercises with a name, muscle group, and tracking type (weight+reps, bodyweight+reps, or time-based).

Does IronStreak support supersets?

You can add any exercise to your workout and order them however you like. Add exercises mid-workout, remove them, and structure your session however works best for you.

Can I see my workout history?

Yes. With IronStreak Pro you get full workout history. Free users see recent workouts.

Does IronStreak work with Apple Health?

IronStreak can write workout summaries to Apple HealthKit (optional). Your data stays on-device and is never sent to external servers.

Start Your Streak

Free to download. No account required. All your data stays on your device.